Print Friendly, PDF & Email

June 2, 2026

Farewell Arlington Bridge

The story of Winnipeg’s Arlington Bridge is set to begin its final chapter. The bridge, which had connected the North End to central Winnipeg since 1912, was designed and built by the Cleveland Bridge and Engineering Company of Darlington, England. The structure is the city’s longest bridge, spanning the Canadian Pacific rail yards. The bridge connected Brown Street, on the north side, to Brant Street, on the south side. Brown and Brant were later renamed Arlington Street.

Originally built as part of a larger vision to improve north-south travel across the city, it was designed to carry streetcars, but its steep approaches made that impossible, resulting in the removal of these tracks in 1926.

Since its construction, an urban legend has circulated claiming the bridge was originally built to cross the Nile River in Egypt. The legend explains that the bridge was too short to span the Nile River, resulting in its sale to the City of Winnipeg at a bargain price. In 1946, newspapers reported the story, and it quickly became embedded in urban lore until it became accepted as truth. Even the city Engineer, William Hurst, backed the story, despite there being no existing concrete evidence.

The truth is, the Arlington Bridge is only two-thirds of the length that would be required to cross the Nile River and its two tributaries. Evidence suggests that the bridge was never built for the Nile, as it was 1,394ft (422m) too short. A more likely possibility is that the bridge was designed for the Nile but never built and was instead redesigned for Winnipeg’s needs. Modifying an existing design drawing is cheaper than creating a new one, thereby saving considerable money, which could account for the lower bid submitted to the city by the Cleveland Bridge Company. This scenario is a plausible alternative to the urban legend.

In 2000, there were three incidents in which trains derailed, striking the bridge piers and supports, causing a two-week closure in each case and requiring major structural repairs to these supports. The bridge has undergone numerous upgrades and repairs over the years. Despite significant corrosion issues, the bridge endures, though it was indefinitely closed in November 2023.

Demolition of the bridge will begin in phases, possibly starting this month, with the southern section removed first, followed by the northern portion in 2027. The work will be done alongside CPKC rail operations below.

For many Winnipeggers, the Arlington Bridge was an important piece of the city’s history. Its demolition marks the end of an era.

Featured Image: The Arlington Bridge in 1946, with the CPR yards below it (cropped). Source: City of Winnipeg Archives Photograph collection (public domain).
logo

 / Recent News

August 21, 2026

Winnipeg Railway Museum Continues Work Toward Reopening

The Winnipeg Railway Museum at VIA Rail’s Union Station, 123 Main Street, continues to work toward reopening its doors to the public, with discussions currently underway with Parks Canada regarding the next steps for the historic museum. The museum has been closed since December 2021 due to safety concerns and required upgrades to the building….

August 18, 2026

Early Birds Save 20% On Heritage Winnipeg’s 2026 Fall Fundraiser Tickets!

Early Bird Special tickets for Heritage Winnipeg’s 2026 Fall Fundraiser are now on sale! Get yours today and join us on Thursday, October 1st, 2026 for an amazing evening in the former Glasgow House at 34 Middle Gate. A deserving winner at Heritage Winnipeg’s 2025 Annual Preservation Awards, this beautifully restored 1911 home has become…

August 7, 2026

Newfound Hope for Marlborough Hotel Redevelopment

Since opening in 1914, the Marlborough Hotel, located at 331 Smith Street, has seen generations of Winnipeggers and visitors pass through its doors for celebrations, conferences, dinners, and overnight stays. It has witnessed the growth of the city, played a role in Canada’s military history, and become an irreplaceable part of Winnipeg’s architectural landscape. However,…

August 6, 2026

City Gives Final Approval to Granite Way Housing Development

The City of Winnipeg has granted final approval for the proposed 12-storey, 110-unit housing development at 30 Granite Way, despite ongoing concerns raised throughout the approval process. At its July 30th meeting, the City’s Property and Development Committee unanimously dismissed appeals related to the development. The project is being led by the University of Winnipeg…

August 5, 2026

Special Discount for Heritage Winnipeg Members this August!

For the month of August, all Heritage Winnipeg members will receive 20% off autographed copies of Winnipeg: Stories Our Buildings Tell, Volume 2! Shipping will be an additional charge. Do not miss your chance to pick up your copy!

August 4, 2026

Heritage Winnipeg Membership Drive

Become a Heritage Winnipeg member today! As a member you will receive our exclusive member newsletter, updates on events, the official blog sent directly to your inbox, and special discounts! The greatest benefit of becoming a Heritage Winnipeg member is knowing that your support helps preserve and celebrate our city’s built heritage. PURCHASE OR RENEW…